Tuesday, October 9, 2012

[SDCPJ] Final Release: No Risky Restart say Public at NRC Meeting on San Onofre




PRESS RELEASE AND MEDIA  ADVISORY

FOR IMMEDIATE RELEASE 

No Risky Restart say Public at NRC Meeting on San Onofre

NRC, Edison to Face Concerned Public at Today's Meeting in Dana Point

Adjudicatory Hearings Demanded to Ensure Safety

EVENT DETAILS:

Event:        Rally / Press Conference
Date/Time:     Tuesday, October 9, 2012, 5pm.
Location:     St. Regis Monarch Bay Hotel, 1 Monarch Beach Resort North, Dana Point, CA 92629
        Patio to the left of the main entrance
Speakers:    Ray Lutz, CitizensOversight.org (MC)
        NRC meeting panelists (who must leave at 5:15 p.m. for NRC briefing)
            Gene Stone, of R.O.S.E. and San Clemente Resident
            Cathy Iwane, resident of Japan during Fukushima disaster
            Don Mosier, Del Mar City Councilmember and Scripps Institution Scientist
            Grace van Thillo, Resident of San Clemente
        Torgen Johnson, Professional Urban planner and Solana Beach Resident
        Ace Hoffman, Nuclear Industry Watchdog and Author
        Chrystal Coleman, Vista Resident and concerned mother           
        Gary Headrick, San Clemente Green

Event:        NRC Meeting
Date/Time:     Tuesday, October 9, 2012, 6pm.
Location:     St. Regis Monarch Bay Hotel, 1 Monarch Beach Resort North, Dana Point, CA 92629
Live Webcast: http://video.nrc.gov.
Audio Stream: 1-888-989-4359; pass code 1369507.
The webcast and phone bridge will be one-way only. Questions or comments can be submitted to the NRC staff after the meeting at: OPA4resource@nrc.gov.

Oct 9, 2012 (SAN ONOFRE) – Experts and oversight groups are astonished by the proposal by Southern California Edison to restart the Unit 2 reactor and run it at 70% capacity, putting millions of residents at risk of another emergency shutdown and radioactivity release to the environment.

The public will rally and sponsor a press conference in opposition to continued operation of the San Onofre nuclear plant at 5:00 p.m., October 9, just prior to the 6:00 p.m. public meeting conducted by the Nuclear Regulatory Commission (NRC) at the St. Regis Monarch Bay Hotel, 1 Monarch Beach Resort North, Dana Point, California.

The citizen coalition opposes Edison's proposed re-start of the defective Unit 2 at San Onofre and demands a full, transparent Adjudicatory Hearing and License Amendment process, including evidentiary hearings with sworn testimony and cross-examination which includes experts independent of the NRC, Edison and the nuclear power industry. This public meeting is NOT a proxy nor a substitute for this process.  Given the emergency shutdown and the serious loss of faith by the public in the NRC and Edison as a result, the coalition can see no reason why all 5 NRC Commissioners would not want this as well.

"The suggestion that the Unit 2 reactor can be restarted throws safety under the profit bus," said Carol Jahnkow of the Peace Resource Center of San Diego. "They are rushing to restart this unsafe reactor to keep the revenue stream flowing from rate-payers. Edison's safety plan to restart San Onofre is to watch for radiation leaks"

A study [3] conducted by nuclear industry expert Dan Hirsch of the Committee to Bridge the Gap and a lecturer at University of California at Santa Cruz will be presented which clearly shows that all steam generators at San Onofre have experienced similar devastating wear during their first few months of operation. Most new steam generators have zero tubes damaged after the first refueling cycle while San Onofre has 1600 and 1800 tubes damaged in the Unit 2 and Unit 3 reactors, respectively.

According to Hirsch, the steam generators in the two reactors exhibit almost identical severe wear patterns. There is no basis to assume that the Unit 2 steam generators are safe to operate at any power level.

"Why is NRC avoiding an investigation?" asked Gary Headrick of San Clemente Green. "If they restart one of these dangerous reactors without the appropriate Adjudicatory Hearing and License Amendment, that would be a violation of the trust we put in our regulatory agencies."

The recent NRC Augmented Inspection Team (AIT) report pointed out that "major design changes" in the steam generators (such as changes in the stay cylinder, tubesheet, tube support plates, and the shape of the tubes) were not considered changes that impacted safety because they were not explicitly mentioned in the "Updated Final Safety Analysis Report" (UFSAR). If they are not explicitly mentioned in the UFSAR, the NRC assumes the design can be changed without limit and still maintain safety. Unfortunately, these details were likely left out of the UFSAR because the original designers never contemplated that the steam generators would ever be replaced.

"Clearly, the steam generators were not like-for-like replacements. If the NRC still says there were no significant changes, then we know the regulatory agency has stopped regulating," said Ray Lutz, an engineer with Citizens' Oversight.

Edison will be shuttling employees to this meeting to try to "push activists to the back of the room" but the reality is that three to five times more jobs will be available in the renewable energy sector, and the activist community is not anti-labor.

"Edison's plan to restart Unit 2 safely is to watch for radiation leaks, that's not a safety plan," said Donna Gilmore of San Onofre Safety. "That's a nuclear experiment. Restarting San Onofre with the the most defective steam generators in the nation is a recipe for nuclear disaster. We just went through nine months without any nuclear power -- why take the risk when we don't need the energy?"

Edison Chair Theodore F. Craver, Jr. admitted that it really was his decision alone to decommission the plant, and that it would be the most difficult decision of his career. The decision to decommission could be made immediately, regardless of NRC processing and inquiries. Continuing the effort to restart the plant will either mean that NRC will look the other way and allow the unsafe plant to restart at reduced power, ignoring the fact that experts agree that this will likely only exacerbate the rattling steam generators, or spending a great deal of money to replace the steam generators once again, with no guarantee that these will work either.

The underlying agenda of SCE, the plant operator, was to "super-charge" the steam generators, essentially upgrading the plant to produce more power without NRC or public approval [1]. SCE Engineers admitted in January that they worked to avoid NRC approval of the changes. In an article in Nuclear Engineering International: "the major premise of the steam generator replacement project was that it would be implemented under the 10CFR50.59 rule, that is, without prior approval by the US Nuclear Regulatory Commission (USNRC)" [2, emphasis added].

CONTACTS:
Citizens' Oversight Committee        Ray Lutz / RayLutz@CitizensOversight.org / 619-820-5321
Peace Resource Center of San Diego        Carol Jahnkow / caroljahnkow@gmail.com / 760-390-0775
Residents Organizing for a Safe        Gene Stone / genston@sbcglobal.net949-233-7724
    Environment (ROSE)                               
San Clemente Green                Gary Headrick / garyheadrick@gmail.com  /  949-218-4051


References:

[1] http://sciencedude.ocregister.com/2012/01/05/powering-up-nuclear-plant-to-boost-output/166317/ -- Powering up: Nuclear plant to boost output -- "The new [steam] generators raised the amount of steam energy produced in the reactors."

[2] http://www.copswiki.org/Common/M1252 -- "Improving Like-for-like RSGs" from Nuclear Engineering International -- Describes the many changes made to the steam generators to increase the steam energy developed.

[3] http://www.copswiki.org/Common/M1307 -- "FAR OUTSIDE THE NORM: The San Onofre Nuclear Plant's Steam Generator Problems in the Context of the National Experience with Replacement Steam Generators"


                    ###
--   -----------------------  Ray Lutz  Citizens' Oversight  CitizensOversight.org  619-820-5321  

_______________________________________________
ShutSanOnofre mailing list
ShutSanOnofre@citizensoversight.org
To subscribe/unsubscribe/manage settings:
http://lists.citizensoversight.org/mailman/listinfo/shutsanonofre



No comments:

The Hidden Enemy

Healing

Healing
Healing

Corruption

Corruption
Corruption in the Senate

Compassion

Compassion
Compassion

Raise the Minimum Wage

Raise the Minimum Wage

Capitolism

Capitolism

Hypocrits

Hypocrits

My New Book About Sudan

Ceasar's Messiah Movie Trailer

The Dark Side of Coffee Trade

Miko Peled "The General's Son" Exposes Israeli Lies

Are these Your Heros?

Are these Your Heros?

National shame

National shame

Law Enforcement Against Prohibition

Stephen Fry on Catholisism

Juanita Ayson on Accupuncture

Interview with Congressman Filner

Free Trade Enslaves Us All

Blog Archive

Farouk Al Nasser

Farouk Al Nasser
Farouk Al Nasser at NCCPJ

Victor Calle

Victor Calle
At NCCP April 2008

Gore Vidal and Floyd Morrow

Gore Vidal and Floyd Morrow
April Fundraiser in San Diego

Tanja and Cindy Sheehan

Tanja and Cindy Sheehan
Fund raiser for Cindy April 2008

CITN

CITN
The Citizens' Internet Television Network

CITRad

CITRad
The Citizens' Internet Radio Network

Save America

Save America
Save America

Fighting

Fighting
Fighting

Believe

Believe
Believe

We Are All One

We Are All One
We Are All One

Secular Humanism

Secular Humanism
Secular Humanism

Change the System

Change the System
Change the System

A Lie Does Not Become the Truth

A Lie Does Not Become the Truth
A lie does not become the truth

Coexist

Coexist
Coexist

Bankers

Bankers
Bankers

Fetus Rights

Fetus Rights
Fetus Rights

The Earth Was Created

The Earth Was Created
The Earth Was Created

Lessons

Lessons
Lessons